Pages

Wednesday, 18 June 2014

Faux Concrete, tarmac and cobbles

This was the scenic part of the model we were dreading. How do we go about raising the level of the ground so that it is level with the top of the rails, which looks authentic and is easy to apply. Well as hinted in a few posts a go, we decided to use the method of flooding the raised areas with DAS Modelling clay.

A test piece was done to find out how we can realistically pattern the cobbles in the clay. The end of a Biro with the writing bit removed, is too big to make cobbles in n gauge, but would you believe it that the actual nib of the pen (non writing side), with the plastic ink tube removed, makes the perfect fit (if a little oversized) for n scaled cobbles. Luckily the area for cobbles at Thornycroft is relatively small, so all in all it took about 45mins of "prodding" the clay to lay the cobbles.


The clay was laid in handful chucks squished down onto a watered down PVA adhesive layer, and then levelled using a stainless steel metal ruler, block of smooth wood, and finger squishing. Although we could never get it perfectly flush and flat. Concrete slaps were scribed into the surface, and a sprinkling of fine sand to create the tarmac surfaces.

The clay was then squished down between the track and sleepers, making sure we kept the top of the rail clean, and the sides deep enough for the trains wheels. Although due to shrinkage the sleepers have left an imprint in the clay. Another thin layer should hopefully reduce this affect.


The buildings fit nicely in their holes, although a few required tweaking with a knife, to square of a few side. The cardboard formers with sticky-back-plastic edges worked pretty well.

It took 3 afternoons so far to get to this stage, and 2 Kg's of DAS clay. I think it was worth it, it has certainly brought the model together.

Painting up next, and working out how to apply the clay in the turn outs and still keep them working. Interesting conundrum.

Ed


No comments:

Post a Comment