Sunday 17 December 2017

Expo. Prep. of Cliddesden Pt. 3

Scenic repairs were undertaken. New rows of turnips are growing well, Cabbages growing in Station Master's garden and fallen wheat stooks up righted.

Electrics

Power controller and turnout motor control survived storage without fault and the layout is operational.

Running Lines

The weak link is the connections between the scenic section and the two outer boards that hold the return track curves. The power between boards is conveyed by copper strips soldered to the rails. These strips touch each other when the boards are locked together. At the join broken solder joints and track out of alignment are recurring problems. These were corrected but may well manifest again. Our method of track connection across board is not ideal and a more reliable method might be devised in future.

Our LSWR M7 tank engine runs satisfactorily. All we need to do now is run train sequences and resolve any other operational problems that might arise before the show.

We'll announce the show venue after Christmas.

David


No comments:

Post a Comment