Thursday, 10 November 2011

Factoid #5

The government paid £2000 per mile of track, just under 12 miles in total, to help efforts in WW1

Wednesday, 9 November 2011

A little inspiration

A few weeks a go, we visited the  Farnham 37th Model Railway Exhibition, on show was plenty of N Gauge (2mmFS) layouts. To my amazement there was a layout that depicts a portion of a proposed branch of Mid Suffolk Light railway, known as Framsden. In many ways the layout is similar to Cliddesden, and the other stations on the Basingstoke and Alton Line. The detail, and size of Framsden is an inspiration for my layout. Here are some pics:


As some people have pointed out Framsden in 2mm Finescale. Thanks for the comments.

Sunday, 6 November 2011

Factoid #4

A small section of the line exists as a memorial, in the middle of the Viables Roundabout in Basingstoke.

Friday, 4 November 2011

LSWR 48' Brake Lav. Tri-Comp. - Final Part

The taller roof vents I believe are both part of the ceiling gas light holder and vent for fumes. The smaller vents coincide with those compartments that allow 'smoking' and simply vent the stale air from the compartment. They were all adapted from spare 00 gauge kit components that looked like vents but were designed for other purposes.

The roof is simply cut out from photo paper. It takes hole drilling for the vent spigots very well.


This was my first attempt at scratch building an 'n' gauge model. From normal viewing distances the coach looks good. Close scrutiny however, does raise eyebrows about the window frame edges. I'm sure this can be improved on the next build but there is no doubt etched brass body sides would be best.


We have also considered punched card or milled metal for the body sides and window cutouts but the specialist tooling required may be prohibitive.


You will see from the posting below that another M7 has been obtained. This one in Southern livery. That means I will be making a second coach, this time in Maunsell olive green with leaf spring bogies for the later period of the line.

To Part 1

Thursday, 3 November 2011

Southern '37' M7

 My dad said, in a previous post:
"To increase variety for the model railway it would be nice to be able to run two M7s, one of each livery for the two periods."


Your wish is my command... Another troll through Ebay, and a Southern '37' 0-4-4 M7 made by Dapol, was up for auction. A few days later and I am now the proud owner. The M7 is exactly the same as the LSWR, but with different graphics. Although this was second hand, it was in pretty good condition, albeit the right vacuum pipe was missing, luckily we had a spare one to replace it with. This now gives the option of being able to run our model railway in the different periods (Pre and Post War).

...Now I just got to work out how to change the scenery at the same time.

Wednesday, 2 November 2011

LSWR 48' Brake Lav. Tri-Comp. - Part 6



Two attempts to make the under-frame. Problem was the solebars that I initially made from card but proved too flimsy. When I scoured my scrap box for ideas I found some double o code 100 flat bottom rail and surprise, surprise it virtually matched the required style and dimensions. The wide flat bottom even looks like the full length step board of the prototype.



Parts for the entire coach, except the bogies, have been hand made from materials already in my possession.



For the under-frame only the most noticeable fittings have been modeled; floor (aluminium), gas tanks (balsa), vacuum pumps (plastic sprue) , V hangers and trusses (brass sprue), buffers (hornby oo track pins) and coupling hook (copper wire), all held together with Superglue.



The final part in this series deals with the roof fabrication.



To Final Part



To Part 1

Tuesday, 1 November 2011

Factoid #3

The Basingstoke and Alton Light Railway, towards the end of it's life was used in 2 Films. Oh, Mr Porter! and The Wrecker